A83 At Rest and Be Thankful To Be Closed For 4 Years

Post any interesting Scottish sailing news here . . .
Post Reply
User avatar
BlowingOldBoots
Old Salt
Posts: 503
Joined: Tue Jul 18, 2023 10:34 am
Boat Type: Rub-a-dub-dub Tub

A83 At Rest and Be Thankful To Be Closed For 4 Years

Post by BlowingOldBoots »

If you drive one the A83 to get to your boat via the Rest and Be Thankful, there is a plan to close it for 4 years while they build a roof over the road to protect against avalanches. There is an uproar from local MPs, businesses and residents. The alternative rout will be a 24/7 convoy system on the lower old military road. I use the road often to get to my boat, so a bit pissed at this, but that's nothing, I assume, if you live there.

If minded to protest against this, there is a link to the petition at the end.

Perhaps this is the best value for the tax payer and at the end of the day the convoy temporary solution will just have to be used.

There are alternative options than the flat roofed lid that is proposed: -

1. A tunnel from butter bridge through the saddle and onto the old military road that would be upgraded.
2. A high-level flyover from honey moon bridge up the middle of the valley to the top of the saddle.
3. A road on the other side which is apparently more stable.
4. Convert the old military road from a single track to a two lane road.
5. Do nothing.

Local MPS have raised a petition to have the closure reviewed as they believe the disruption is untenable.

Road Closure Information

https://transportnews.co.uk/2026/10/12/ ... sure-plan/

The Petition

https://you.38degrees.org.uk/petitions/ ... e1f42b719e

The Design

https://www.newcivilengineer.com/latest ... 1-06-2024/

Update
According to Alan Reid, former Lib Dem MSP and candidate at the last MSP election, he has advised that the Scottish Government will now review the closure option. He also states that no budget has been assigned to build the road. However, I can't find any news on the SG web pages, so Alan Reid might be wrong on this.

https://www.abld.uk/news/article/alan-r ... e-thankful

Still, let your voice be heard, if this issue resonates with you.
What's that? Dunno! Should we be worried about that? Dunno! How? Ah dunno!
stevepick
Master Mariner
Posts: 205
Joined: Thu Apr 19, 2007 3:28 pm
Boat Type: Dufour 40
Location: Lanark

Re: A83 At Rest and Be Thankful To Be Closed For 4 Years

Post by stevepick »

I don't understand, why the proposed roof flat? IIRC this structure in european alpine countries has a sloping roof to shed debris.

How on earth is this going to take 4 years? Has an italian or swiss contractor been used to do this properly, and with an appropriate amount of background experience? Or is it money for old rope to a UK contractor who have never done this, and appear to never have driven from Calais to the Dolomites ?
User avatar
BlowingOldBoots
Old Salt
Posts: 503
Joined: Tue Jul 18, 2023 10:34 am
Boat Type: Rub-a-dub-dub Tub

Re: A83 At Rest and Be Thankful To Be Closed For 4 Years

Post by BlowingOldBoots »

From the link to the design description in my OP.
Shackman pointed out that the roof of the debris flow shelter actually slopes back towards the hillside, not away from it.

“That’s to avoid the debris, when it falls down on the shelter, [from] falling down the slope and then undermining the slope and the foundations,” he said. “It’s more efficient trying to catch the debris at the back of the wall [and trapping it against the hillside] and then picking it up and taking it away when an event occurs.”
The roof is designed to hold the weight of rock and diggers to drive on top of it to clear away the debris. No doubt they will have to enter the gap between the tunnel and the hillside to clear that rock as well. I wonder if the road will be closed while they do this. That is not mentioned.

I tend to believe that governments do the right thing, the new forth crossing being a good example. The A9 and CalMac ferries also being good examples of how they don't do the right thing.

As usual, we shall see, because they will not listen to the public, consultants funding output needs to be justified.
What's that? Dunno! Should we be worried about that? Dunno! How? Ah dunno!
User avatar
BlowingOldBoots
Old Salt
Posts: 503
Joined: Tue Jul 18, 2023 10:34 am
Boat Type: Rub-a-dub-dub Tub

Re: A83 At Rest and Be Thankful To Be Closed For 4 Years

Post by BlowingOldBoots »

These are the 11 "Corridor Options" for the proposed link. I quite like the idea of 5, 7, 9 and 11 bridges.

https://www.transport.gov.scot/publicat ... -bute-a83/
What's that? Dunno! Should we be worried about that? Dunno! How? Ah dunno!
Post Reply